← Back to map

High Lonesome Wind Power, LLC Hybrid

Upton County, Texas · EIA plant ID 62562 · Operator: High Lonesome Wind Power, LLC
WindBatteriesOnshore Wind TurbineERCOTBA: ERCO
Nameplate563MWSummer 551 MW
Generators3in service
Net generation1,582GWh12 mo to Aug 2026
Capacity factor36%wind units, summer MW
Heat rate—thermal plants only
First online2023

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
050100150GWh202120222023202420252026

Capacity factor by year

Net MWh ÷ (summer MW × hours), wind units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%20%40%2023202420252026202736.2% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
2020461.2——
20211,501.8——
20221,206.5——
20231,05548.0%—
20241,181.427.0%—
20251,265.828.9%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
BABatteriesBA63.351Jun 2023Operating—coming soon
HILOOnshore Wind TurbineWT449.5449.5Jul 2023Operating—acciona AW132/3000
HILO2Onshore Wind TurbineWT5050Jul 2023Operating—ge 2.3-116

Owner / operator

Operator: High Lonesome Wind Power, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
High Lonesome Wind Power, LLC100.0%563 MW

Nearby plants

Within 80 km.
Appaloosa Run Wind172 MW5 km
Big Sampson Wind—21.3 km
King Mountain Solar175 MW24.1 km
Roadrunner, LLC Hybrid463 MW30.1 km
Desert Sky168 MW34.4 km
King Mountain Wind Ranch 1278 MW34.5 km