← Back to map

Roadrunner, LLC Hybrid

Upton County, Texas · EIA plant ID 62561 · Operator: Roadrunner Solar, LLC
SolarBatteriesSolar PhotovoltaicERCOTBA: ERCO
Nameplate463MWSummer 450 MW
Generators3in service
Net generation1,023GWh12 mo to Aug 2026
Capacity factor29%solar units, summer MW
Heat rate—thermal plants only
First online2019

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
050100GWh2020202120222023202420252026

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%20%40%60%2020202120222023202420252026202729.3% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
2020854.158.1%—
2021984.728.1%—
20221,010.928.8%—
20231,010.328.9%—
20241,007.528.7%—
20251,080.330.8%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
BABatteriesBA63.350Jul 2023Operating—coming soon
RODR1Solar PhotovoltaicPV200200Nov 2019Operating—coming soon
RODR2Solar PhotovoltaicPV200200Sep 2020Operating—coming soon

Owner / operator

Operator: Roadrunner Solar, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Roadrunner Solar, LLC100.0%463 MW

Nearby plants

Within 80 km.
King Mountain Wind Ranch 1278 MW4.8 km
King Mountain Solar175 MW6.8 km
Castle Gap Solar Hybrid190 MW8.6 km
Upton County Solar150 MW9.6 km
Revolution150 MW11.2 km
CED Crane Solar150 MW12 km