Upton County, Texas · EIA plant ID 60123 · Operator: Upton County Solar 2 LLC
SolarBatteriesSolar PhotovoltaicERCOTBA: ERCO
Nameplate190MWSummer 190 MW
Generators2in service
Net generation352GWh12 mo to Aug 2026
Capacity factor22%solar units, summer MW
Heat rate—thermal plants only
First online2018

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
02040GWh20192020202120222023202420252026

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%2018202020222024202622.3% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
2018300.228.4%—
2019432.227.6%—
2020408.126.7%—
2021427.628.0%—
2022451.229.1%—
2023396.225.2%—
2024396.125.1%—
2025384.224.4%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
BAT1BatteriesBA9.99.9Jun 2019Operating—coming soon
CGAPSolar PhotovoltaicPV180180May 2018Operating—coming soon

Owner / operator

Operator: Upton County Solar 2 LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Upton County Solar 2 LLC100.0%190 MW

Nearby plants

Within 80 km.
Upton County Solar150 MW2.3 km
CED Crane Solar150 MW3.8 km
Revolution150 MW4.2 km
Upton County BESS25 MW5 km
King Mountain Wind Ranch 1278 MW5.9 km
Mendoza Trail BESS200 MW8 km