← Back to map

Upton County Solar

Upton County, Texas · EIA plant ID 60581 · Operator: RWE Clean Energy
SolarSolar PhotovoltaicERCOTBA: ERCO
Nameplate150MWSummer 150 MW
Generators1in service
Net generation274GWh12 mo to Aug 2026
Capacity factor21%solar units, summer MW
Heat rate—thermal plants only
First online2017

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
010203040GWh201820192020202120222023202420252026

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%30%2018202020222024202620.9% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20172219.7%—
2018397.830.3%—
2019403.730.7%—
2020352.326.7%—
2021355.627.1%—
2022359.927.4%—
2023317.624.2%—
2024309.523.5%—
2025299.122.8%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
UCTXSolar PhotovoltaicPV150150Dec 2017Operating—coming soon

Owner / operator

Operator: RWE Clean Energy. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
RWE Clean Energy100.0%150 MW

Nearby plants

Within 80 km.
Revolution150 MW2 km
Castle Gap Solar Hybrid190 MW2.3 km
CED Crane Solar150 MW2.5 km
Upton County BESS25 MW3 km
King Mountain Wind Ranch 1278 MW5.9 km
Mendoza Trail BESS200 MW5.9 km