← Back to map

Tipton Solar Park

Tipton County, Indiana · EIA plant ID 62305 · Operator: Indiana Municipal Power Agency
SolarSolar PhotovoltaicMISOBA: MISO
Nameplate5MWSummer 5 MW
Generators1in service
Net generation9GWh12 mo to Dec 2025
Capacity factor19%solar units, summer MW
Heat rate—thermal plants only
First online2019

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
00.51GWh202020212022202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%2019202020212022202320242025202618.8% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20195.322.5%—
20209.219.7%—
20219.320.0%—
20229.520.4%—
2023919.5%—
20249.119.5%—
20258.718.8%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
STIPSolar PhotovoltaicPV5.35.3Jul 2019Operating—coming soon

Owner / operator

Operator: Indiana Municipal Power Agency. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Tipton Solar Array, LLC100.0%5 MW

Nearby plants

Within 80 km.
IMPA Tipton 2 Solar Park3 MW2.4 km
Sheridan School Corporation Solar2 MW19.1 km
Wildcat Wind Farm I, LLC200 MW21.4 km
Noblesville283 MW21.8 km
Kokomo Solar 1, LLC5 MW22.7 km
IMPA Frankton Solar Park1 MW26.5 km