Sheridan School Corporation Solar
Hamilton County, Indiana · EIA plant ID 63213 · Operator: Johnson Melloh Solutions
Nameplate2MWSummer 1 MW
Generators2in service
Net generation2GWh12 mo to Dec 2025
Capacity factor27%solar units, summer MW
Heat rate—thermal plants only
First online2016
Monthly net generation
EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
Capacity factor by year
Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
| Year | Net GWh | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|
| 2019 | 2 | 28.1% | — |
| 2020 | 2 | 28.5% | — |
| 2021 | 2 | 29.1% | — |
| 2022 | 1.5 | 20.8% | — |
| 2023 | 1.9 | 27.4% | — |
| 2024 | 1.9 | 26.5% | — |
| 2025 | 1.9 | 27.0% | — |
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| 418ES | Solar Photovoltaic | PV | 0.6 | 0.4 | Jun 2016 | Operating | — | coming soon |
| 418HS | Solar Photovoltaic | PV | 0.9 | 0.4 | Dec 2016 | Operating | — | coming soon |
Owner / operator
Operator: Johnson Melloh Solutions. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
| Sheridan School Corporation | 100.0% | 2 MW |
Nearby plants
Within 80 km.
| Tipton Solar Park | 5 MW | 19.1 km |
| Noblesville | 283 MW | 21.3 km |
| IMPA Tipton 2 Solar Park | 3 MW | 21.5 km |
| Marion Solar LNG | 2 MW | 25.3 km |
| Duke Building 129 | 3 MW | 25.6 km |
| Duke Building 98 | 3 MW | 26.5 km |