Wildcat Wind Farm I, LLC
Tipton County, Indiana · EIA plant ID 57862 · Operator: RWE Clean Energy
Nameplate200MWSummer 200 MW
Generators1in service
Net generation672GWh12 mo to Dec 2025
Capacity factor38%wind units, summer MW
Heat rate—thermal plants only
First online2012
Monthly net generation
EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
Capacity factor by year
Net MWh ÷ (summer MW × hours), wind units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
| Year | Net GWh | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|
| 2012 | 50.4 | 33.9% | — |
| 2013 | 627.7 | 35.8% | — |
| 2014 | 661.5 | 37.8% | — |
| 2015 | 648.4 | 37.0% | — |
| 2016 | 662.5 | 37.7% | — |
| 2017 | 698.2 | 39.9% | — |
| 2018 | 624.2 | 35.6% | — |
| 2019 | 484.4 | 27.7% | — |
| 2020 | 596 | 33.9% | — |
| 2021 | 640.1 | 36.5% | — |
| 2022 | 718.7 | 41.0% | — |
| 2023 | 649.9 | 37.1% | — |
| 2024 | 673.8 | 38.4% | — |
| 2025 | 671.7 | 38.3% | — |
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| 1 | Onshore Wind Turbine | WT | 200 | 200 | Dec 2012 | Operating | — | ge 1.6 XLE |
Owner / operator
Operator: RWE Clean Energy. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
| RWE Clean Energy | 100.0% | 200 MW |
Nearby plants
Within 80 km.
| IMPA Frankton Solar Park | 1 MW | 15.9 km |
| POET Biorefining- Alexandria, LLC | 4 MW | 17.1 km |
| IMPA Tipton 2 Solar Park | 3 MW | 19.4 km |
| Tipton Solar Park | 5 MW | 21.4 km |
| Deer Creek PV | 3 MW | 24.8 km |
| IMPA Anderson Solar Park 2 | 8 MW | 26.8 km |