← Back to map

CNMEC Solar Energy Center

Torrance County, New Mexico · EIA plant ID 62191 · Operator: Exus New Mexico
SolarSolar PhotovoltaicBA: PNM
Nameplate2MWSummer 2 MW
Generators1in service
Net generation5GWh12 mo to Dec 2025
Capacity factor31%solar units, summer MW
Heat rate—thermal plants only
First online2018

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0200400600MWh2019202020212022202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%30%20182019202020212022202320242025202631.3% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20181.227.3%—
20195.229.8%—
20205.632.1%—
20215.632.0%—
20225.531.6%—
20235.531.5%—
20245.531.4%—
20255.531.3%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
CNMECSolar PhotovoltaicPV22Oct 2018Operating—coming soon

Owner / operator

Operator: Exus New Mexico. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Exus New Mexico100.0%2 MW

Nearby plants

Within 80 km.
Britton Solar Energy Center50 MW26.2 km
La Joya NM306 MW28.6 km
High Lonesome Mesa LLC100 MW36.1 km
Meadow Lake Solar Energy Center9 MW42.9 km
Eubank Landfill Solar Array2 MW52.7 km
Sandia Energy Center60 MW53.1 km