← Back to map

La Joya NM

Torrance County, New Mexico · EIA plant ID 61044 · Operator: Avangrid Renewables Inc
WindOnshore Wind TurbineBA: PNM
Nameplate306MWSummer 306 MW
Generators2in service
Net generation875GWh12 mo to Aug 2026
Capacity factor33%wind units, summer MW
Heat rate—thermal plants only
First online2021

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
050100150GWh20222023202420252026

Capacity factor by year

Net MWh ÷ (summer MW × hours), wind units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%20%40%202120222023202420252026202732.6% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
2021755.736.9%—
20221,001.337.3%—
20231,076.340.1%—
2024990.436.8%—
2025905.833.8%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
LAJ1Onshore Wind TurbineWT165165Feb 2021Operating—ge 2.82-127
LAJ2Onshore Wind TurbineWT141.2141.2Jun 2021Operating—siemens gamesa SG 2.6-114
WT1Onshore Wind TurbineWT166166planned Dec 2020not_current—coming soon

Owner / operator

Operator: Avangrid Renewables Inc. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Avangrid Renewables Inc100.0%306 MW

Nearby plants

Within 80 km.
CNMEC Solar Energy Center2 MW28.6 km
El Cabo Wind298 MW31 km
Britton Solar Energy Center50 MW39.9 km
High Lonesome Mesa LLC100 MW43.3 km
Duran Mesa LLC105 MW51.9 km
Tecolote Wind LLC272 MW57.1 km