Colleton SolarPlanned

Colleton County, South Carolina · EIA plant ID 62188 · Operator: Colleton Solar
BatteryBA: SCEG

75 MW planned (Solar Photovoltaic), first expected Nov 2028 · EIA-860M

Nameplate—MWSummer — MW
Generators0in service
Net generation—GWh12 mo
Capacity factor—not meaningful for storage
Heat rate—thermal plants only
First online—

Capacity factor by year

Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
No capacity factor available.

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
30Solar PhotovoltaicPV74.974.9planned Nov 2028Planned—coming soon

Owner / operator

Operator: Colleton Solar. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).

Nearby plants

Within 80 km.
TWE Bowman Solar Project75 MW26.1 km
Colleton Solar Farm3 MW27.3 km
Palmetto Plains75 MW27.6 km
Huntley75 MW30.5 km
Cope417 MW31.9 km
Rowesville Rd Plant10 MW34.8 km