← Back to map

TWE Bowman Solar Project

Orangeburg County, South Carolina · EIA plant ID 62828 · Operator: SunStrong Management
SolarSolar PhotovoltaicBA: SCEG
Nameplate75MWSummer 73 MW
Generators1in service
Net generation130GWh12 mo to Aug 2026
Capacity factor20%solar units, summer MW
Heat rate—thermal plants only
First online2020

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
051015GWh202120222023202420252026

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%2020202120222023202420252026202720.3% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
2020104.124.2%—
2021142.422.2%—
2022144.622.6%—
2023131.320.5%—
2024121.618.9%—
2025143.822.5%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
BOWSolar PhotovoltaicPV7573.1May 2020Operating—coming soon

Owner / operator

Operator: SunStrong Management. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
SunStrong Management100.0%75 MW

Nearby plants

Within 80 km.
Palmetto Plains75 MW3 km
Huntley75 MW5 km
Substation 20 Plant2 MW20.2 km
Rowesville Rd Plant10 MW20.3 km
Dorchester Biomass23 MW23.2 km
SR Cordova—24.9 km