← Back to map

Ivester Wind Farm

Grundy County, Iowa · EIA plant ID 61911 · Operator: MidAmerican Energy Co
WindOnshore Wind TurbineMISOBA: MISO
Nameplate91MWSummer 90 MW
Generators1in service
Net generation323GWh12 mo to Aug 2026
Capacity factor41%wind units, summer MW
Heat rate—thermal plants only
First online2018

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
010203040GWh20192020202120222023202420252026

Capacity factor by year

Net MWh ÷ (summer MW × hours), wind units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%20%40%2018202020222024202641.0% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20189.614.2%—
201925732.3%—
2020300.737.7%—
2021322.140.5%—
2022364.946.3%—
2023321.840.8%—
2024340.743.1%—
2025328.141.6%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
WT1Onshore Wind TurbineWT90.890Dec 2018Operating—siemens SWT-2.625-120

Owner / operator

Operator: MidAmerican Energy Co. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
MidAmerican Energy Co100.0%91 MW

Nearby plants

Within 80 km.
Wellsburg Wind Project141 MW6.6 km
Grundy Center City Light Plant9 MW14.7 km
Vienna Wind Farm150 MW23.9 km
Dike City Power Plant2 MW29.9 km
Alliant SBD 9107 JBS USA11 MW31.1 km
Marshalltown189 MW32.6 km