← Back to map

Kearney NPPD Solar Project

Buffalo County, Nebraska · EIA plant ID 61884 · Operator: SoCore Energy LLC
SolarSolar PhotovoltaicSPPBA: SWPP
Nameplate6MWSummer 6 MW
Generators1in service
Net generation8GWh12 mo to Dec 2025
Capacity factor15%solar units, summer MW
Heat rate—thermal plants only
First online2017

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
00.511.5GWh20182019202020212022202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%20182019202020212022202320242025202615.4% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
201811.121.8%—
201910.620.8%—
202011.422.3%—
202112.224.1%—
202212.524.5%—
202311.522.7%—
20248.616.9%—
20257.815.4%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
PV1Solar PhotovoltaicPV5.85.8Dec 2017Operating—coming soon

Owner / operator

Operator: SoCore Energy LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
SoCore 2016 ProjectCo 2 LLC100.0%6 MW

Nearby plants

Within 80 km.
Kearney2 MW5.4 km
SPPW1, LLC6 MW45.9 km
Hastings Community Solar Farm2 MW52.7 km
Campbell Village1 MW53.7 km
Don Henry22 MW54.6 km
Canaday109 MW55.7 km