Hastings Community Solar Farm
Adams County, Nebraska · EIA plant ID 62833 · Operator: City of Hastings - (NE)
Nameplate2MWSummer 0 MW
Generators1in service
Net generation3GWh12 mo to Dec 2025
Capacity factor129%!solar units, summer MW
Heat rate—thermal plants only
First online2019
Monthly net generation
EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
Capacity factor by year
Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
| Year | Net GWh | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|
| 2019 | 0.7 | 78.1% | — |
| 2020 | 3.6 | 134.8% | — |
| 2021 | 3.5 | 133.1% | — |
| 2022 | 4 | 150.5% | — |
| 2023 | 3.5 | 134.8% | — |
| 2024 | 3.5 | 133.7% | — |
| 2025 | 3.4 | 128.6% | — |
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| PV | Solar Photovoltaic | PV | 1.5 | 0.3 | Sep 2019 | Operating | — | coming soon |
Owner / operator
Operator: City of Hastings - (NE). Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
| City of Hastings - (NE) | 100.0% | 2 MW |
Nearby plants
Within 80 km.
| Don Henry | 22 MW | 2.5 km |
| North Denver | 39 MW | 4.1 km |
| CCC Hastings Wind Turbine | 2 MW | 9.4 km |
| Whelan Energy Center | 324 MW | 10.8 km |
| Platte | 110 MW | 29.1 km |
| City Light & Water | 1 MW | 30.5 km |