Nameplate22MWSummer 18 MW
Generators1in service
Net generation0GWh12 mo to Dec 2025
Capacity factor0%gas/coal/oil units, summer MW
Heat rate—Btu/kWhfossil units, electric fuel, HHV
First online1972Runs as rarely runs
Monthly net generation
EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
Capacity factor by year
Net MWh ÷ (summer MW × hours), gas/coal/oil units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Annual data table
| Year | Net GWh | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|
| 2001 | 0.3 | 0.2% | — |
| 2002 | 0.9 | 0.6% | 24,858 |
| 2003 | 0.1 | 0.1% | — |
| 2004 | -0.1 | -0.1% | — |
| 2005 | -0 | -0.0% | — |
| 2006 | 0.9 | 0.5% | 22,599 |
| 2007 | 0.3 | 0.2% | — |
| 2008 | -0.1 | -0.1% | — |
| 2009 | -0 | -0.0% | — |
| 2010 | -0 | -0.0% | — |
| 2011 | -0 | -0.0% | — |
| 2012 | 0.4 | 0.2% | 25,349 |
| 2013 | 0 | 0.0% | — |
| 2014 | -0 | -0.0% | — |
| 2015 | -0 | -0.0% | — |
| 2016 | -0 | -0.0% | — |
| 2017 | 0 | 0.0% | — |
| 2018 | 0.1 | 0.1% | — |
| 2019 | -0.5 | -0.3% | — |
| 2020 | 0 | 0.0% | — |
| 2021 | 1.5 | 0.9% | 22,243 |
| 2022 | 2.3 | 1.5% | 19,515 |
| 2023 | 1.1 | 0.7% | 23,892 |
| 2024 | 0.6 | 0.4% | — |
| 2025 | 0.5 | 0.3% | — |
Fuel capability
Gas-fired turbines (CT/GT/CA/CS) that can also burn liquid fuel. EIA-860 Schedule 3 for capability, EIA-923 for actual burn.
StatusListed in EIA-860, no liquid burn in 36 months
Liquid fuel burned · 36 mo0 MMBtu
Last month with liquid burn—
Switch while operatingNo
Net summer MW on gas18
Net summer MW on oil18
Time gas → oilup to 1 h (EIA 1H)
Time oil → gasup to 1 h (EIA 1H)
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| 1 | Natural Gas Fired Combustion Turbine | GT | 22 | 18 | Jun 1972 | Operating (Standby / backup) | — | coming soon |
Owner / operator
Operator: City of Hastings - (NE). Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
| City of Hastings - (NE) | 100.0% | 22 MW |
Nearby plants
Within 80 km.
| Hastings Community Solar Farm | 2 MW | 2.5 km |
| North Denver | 39 MW | 3.2 km |
| CCC Hastings Wind Turbine | 2 MW | 7.4 km |
| Whelan Energy Center | 324 MW | 9.1 km |
| City Light & Water | 1 MW | 28.5 km |
| Platte | 110 MW | 30.8 km |