Raccoon Mountain

Hamilton County, Tennessee · EIA plant ID 6151 · Operator: Tennessee Valley Authority
HydroHydroelectric Pumped StorageBA: TVA
Nameplate1,714MWSummer 1,616 MW
Generators4in service
Net generation-624GWh12 mo to Aug 2026
Capacity factor—not meaningful for storage
Heat rate—thermal plants only
First online1978

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
-100-75-50-250GWh2001200320052007200920112013201520172019202120232025

Capacity factor by year

Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
No capacity factor available.

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
2001-733.7——
2002-695.8——
2003-728.6——
2004-817.8——
2005-597.9——
2006-667.5——
2007-704.4——
2008-738.7——
2009-649.8——
2010-721.5——
2011-660.4——
2012-162.9——
2013-42——
2014-491.2——
2015-530.7——
2016-703.9——
2017-686.2——
2018-619.8——
2019-615.4——
2020-721——
2021-577.3——
2022-491.3——
2023-553.8——
2024-570.8——
2025-537.5——

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
1Hydroelectric Pumped StoragePS428.4404.7Jan 1979Operating—coming soon
2Hydroelectric Pumped StoragePS428.4404.1Dec 1978Operating—coming soon
3Hydroelectric Pumped StoragePS428.4403.5Feb 1979Operating—coming soon
4Hydroelectric Pumped StoragePS428.4404Aug 1979Operating—coming soon

Owner / operator

Operator: Tennessee Valley Authority. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Tennessee Valley Authority100.0%1,714 MW

Nearby plants

Within 80 km.
Chickamauga160 MW15.3 km
Chattanooga Metropolitan Airport Solar3 MW16.7 km
Nickajack104 MW22.1 km
Volkswagen Solar System8 MW24.2 km
Sequoyah2,441 MW33 km
Crawfish Creek Energy Storage—35.8 km