← Back to map

Volkswagen Solar System

Hamilton County, Tennessee · EIA plant ID 58401 · Operator: SR Enterprise South LLC
SolarSolar PhotovoltaicBA: TVA
Nameplate8MWSummer 8 MW
Generators1in service
Net generation11GWh12 mo to Aug 2026
Capacity factor16%solar units, summer MW
Heat rate—thermal plants only
First online2012

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
00.511.5GWh20132014201520162017201820192020202120222023202420252026

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%201420162018202020222024202615.8% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
201313.319.2%—
20141420.2%—
201512.918.7%—
201614.320.6%—
201712.918.6%—
201811.617.5%—
201912.418.6%—
202011.917.8%—
202111.717.6%—
202211.216.8%—
202311.116.7%—
202411.717.5%—
202512.418.6%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
1Solar PhotovoltaicPV7.67.6Nov 2012Operating—coming soon

Owner / operator

Operator: SR Enterprise South LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
SR Enterprise South LLC100.0%8 MW

Nearby plants

Within 80 km.
Chickamauga160 MW9.3 km
Chattanooga Metropolitan Airport Solar3 MW11 km
Sequoyah2,441 MW14.7 km
Whitfield Cooper1 MW23.1 km
Raccoon Mountain1,714 MW24.2 km
SR Sequatchie8 MW39.5 km