Golden Hills Solar

Worcester County, Massachusetts · EIA plant ID 61315 · Operator: Golden Hills Solar, LLC
SolarSolar PhotovoltaicISONEBA: ISNE
Nameplate5MWSummer 5 MW
Generators1in service
Net generation7GWh12 mo to Dec 2025
Capacity factor18%solar units, summer MW
Heat rate—thermal plants only
First online2017

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
00.250.50.751GWh20182019202020212022202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%2018202020222024202617.9% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20171.39.3%—
20187.317.6%—
20197.418.1%—
20207.919.2%—
20217.618.5%—
20228.119.6%—
20237.518.3%—
20247.818.9%—
20257.417.9%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
2196Solar PhotovoltaicPV4.74.7Sep 2017Operating—coming soon

Owner / operator

Operator: Golden Hills Solar, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Golden Hills Solar, LLC100.0%5 MW

Nearby plants

Within 80 km.
RGS-Rutland VNM SREC II Project (MA)2 MW4 km
Upper Blackstone (MA) Treasure Valley5 MW7.5 km
Stetson Road Solar - Barre I2 MW8.4 km
KS Solar Six LLC2 MW8.7 km
Pleasantdale Road Community Solar1 MW8.7 km
Barre Solar III LLC1 MW9.6 km