← Back to map

Pleasantdale Road Community Solar

Worcester County, Massachusetts · EIA plant ID 61298 · Operator: Pleasantdale Road Solar, LLC
SolarSolar PhotovoltaicISONEBA: ISNE
Nameplate1MWSummer 1 MW
Generators1in service
Net generation1GWh12 mo to Dec 2025
Capacity factor15%solar units, summer MW
Heat rate—thermal plants only
First online2017

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
050100150200MWh20182019202020212022202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%5%10%15%2018202020222024202615.2% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20170.27.5%—
20181.415.8%—
20191.416.5%—
20201.517.0%—
20211.415.7%—
20221.516.7%—
20231.415.8%—
20241.415.5%—
20251.315.2%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
2112Solar PhotovoltaicPV11Sep 2017Operating—coming soon

Owner / operator

Operator: Pleasantdale Road Solar, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Pleasantdale Road Solar, LLC100.0%1 MW

Nearby plants

Within 80 km.
Upper Blackstone (MA) Treasure Valley5 MW1.2 km
SJA Solar LLC-Solterra Monastery CSG15 MW4.7 km
Paxton BESS 13 MW4.9 km
ZPD-PT Solar Project 2017-044 LLC CSG1 MW5.2 km
Wilson Solar2 MW6.5 km
Blair Wire Village Solar, LLC CSG1 MW7.1 km