Upper Blackstone (MA) Treasure Valley

Worcester County, Massachusetts · EIA plant ID 59781 · Operator: Nexamp Treasure Valley Solar, LLC
SolarSolar PhotovoltaicISONEBA: ISNE
Nameplate5MWSummer 5 MW
Generators1in service
Net generation6GWh12 mo to Dec 2025
Capacity factor14%solar units, summer MW
Heat rate—thermal plants only
First online2014

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0200400600800MWh20152016201720182019202020212022202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%5%10%15%201420162018202020222024202614.2% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20142.712.2%—
20157.416.9%—
20167.817.7%—
20175.713.0%—
20186.615.0%—
2019715.9%—
20206.915.7%—
20217.116.1%—
20227.116.1%—
20236.915.7%—
20247.316.5%—
20256.214.2%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
1Solar PhotovoltaicPV55Jul 2014Operating—coming soon

Owner / operator

Operator: Nexamp Treasure Valley Solar, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Nexamp Treasure Valley Solar, LLC100.0%5 MW

Nearby plants

Within 80 km.
Pleasantdale Road Community Solar1 MW1.2 km
SJA Solar LLC-Solterra Monastery CSG15 MW5.8 km
Paxton BESS 13 MW5.8 km
ZPD-PT Solar Project 2017-044 LLC CSG1 MW6.3 km
Golden Hills Solar5 MW7.5 km
Wilson Solar2 MW7.7 km