← Back to map

Hickory Run Energy Station

Lawrence County, Pennsylvania · EIA plant ID 61028 · Operator: Hickory Run Energy, LLC
Natural gasNatural Gas Fired Combined CyclePJMBA: PJM
Nameplate1,034MWSummer 962 MW
Generators3in service
Net generation6,866GWh12 mo to Aug 2026
Capacity factor81%gas/coal/oil units, summer MW
Heat rate6,633Btu/kWhfossil units, electric fuel, HHV
First online2020Runs as baseload

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0200400600GWh202120222023202420252026

Capacity factor by year

Net MWh ÷ (summer MW × hours), gas/coal/oil units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%25%50%75%2020202120222023202420252026202781.5% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
6,5006,6006,7006,800202020212022202320242025202620276,633 Btu/kWh · 12 mo
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20203,93969.0%6,728
20216,372.477.1%6,729
20226,185.572.1%6,839
20236,56776.5%6,698
20245,495.566.7%6,658
20256,668.679.1%6,624

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
CTG1Natural Gas Fired Combined CycleCT295273.5May 2020Operating—coming soon
CTG2Natural Gas Fired Combined CycleCT295274.6May 2020Operating—coming soon
STG1Natural Gas Fired Combined CycleCA443.7414.2May 2020Operating—coming soon

Owner / operator

Operator: Hickory Run Energy, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Hickory Run Energy, LLC100.0%1,034 MW

Nearby plants

Within 80 km.
Firefly Solar PA—7.1 km
Carbon Limestoneretired7.6 km
New Castle Plant354 MW8.1 km
Mahoning4 MW15.8 km
Beaver Valley Patterson Dam1 MW29.4 km
Townsend Hydro5 MW30.6 km