Mahoning
Mahoning County, Ohio · EIA plant ID 57411 · Operator: WM Renewable Energy LLC
Nameplate4MWSummer 4 MW
Generators5in service
Net generation27GWh12 mo to Dec 2025
Capacity factor78%other units, summer MW
Heat rate—thermal plants only
First online2013
Monthly net generation
EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
Capacity factor by year
Net MWh ÷ (summer MW × hours), other units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
| Year | Net GWh | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|
| 2013 | 25.1 | 71.6% | — |
| 2014 | 23.9 | 68.3% | — |
| 2015 | 32 | 91.4% | — |
| 2016 | 27.2 | 77.3% | — |
| 2017 | 26.8 | 76.5% | — |
| 2018 | 32.4 | 92.5% | — |
| 2019 | 30.4 | 86.7% | — |
| 2020 | 28.5 | 81.0% | — |
| 2021 | 30.3 | 86.5% | — |
| 2022 | 26.7 | 76.2% | — |
| 2023 | 28.9 | 82.4% | — |
| 2024 | 26.8 | 76.4% | — |
| 2025 | 27.4 | 78.2% | — |
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| GEN1 | Landfill Gas | IC | 0.8 | 0.8 | Jan 2013 | Operating | — | coming soon |
| GEN2 | Landfill Gas | IC | 0.8 | 0.8 | Jan 2013 | Operating | — | coming soon |
| GEN3 | Landfill Gas | IC | 0.8 | 0.8 | Jan 2013 | Operating | — | coming soon |
| GEN4 | Landfill Gas | IC | 0.8 | 0.8 | Jan 2013 | Operating | — | coming soon |
| GEN5 | Landfill Gas | IC | 0.8 | 0.8 | Jan 2013 | Operating | — | coming soon |
Owner / operator
Operator: WM Renewable Energy LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
| WM Renewable Energy LLC | 100.0% | 4 MW |
Nearby plants
Within 80 km.
| Carbon Limestone | retired | 10.7 km |
| Firefly Solar PA | — | 13 km |
| Hickory Run Energy Station | 1,034 MW | 15.8 km |
| New Castle Plant | 354 MW | 18.4 km |
| Beaver Valley Patterson Dam | 1 MW | 29.5 km |
| Townsend Hydro | 5 MW | 30.4 km |