Cactus Flats Wind Energy Project

Concho County, Texas · EIA plant ID 61001 · Operator: Southern Power Co
WindOnshore Wind TurbineERCOTBA: ERCO
Nameplate148MWSummer 148 MW
Generators1in service
Net generation439GWh12 mo to Aug 2026
Capacity factor34%wind units, summer MW
Heat rate—thermal plants only
First online2018

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
02040GWh20192020202120222023202420252026

Capacity factor by year

Net MWh ÷ (summer MW × hours), wind units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%20%40%2018202020222024202633.7% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
2018201.630.4%—
2019517.739.4%—
2020492.837.8%—
2021433.833.4%—
2022433.633.4%—
2023459.835.4%—
2024455.835.0%—
2025439.133.8%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
WT1Onshore Wind TurbineWT148.4148.4Jul 2018Operating—vestas V126-3.45

Owner / operator

Operator: Southern Power Co. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
SP Cactus Flats Wind Energy, LLC100.0%148 MW

Nearby plants

Within 80 km.
Pioneer Field Wind Power—19.7 km
Maverick Creek Wind492 MW24.2 km
Concho Valley Solar, LLC173 MW24.4 km
Galloway 2 Solar Farm110 MW39 km
Lucy Solar—40.2 km
Concho Pearl Solar and Storage—40.3 km