Lucy SolarUnder construction
Concho County, Texas · EIA plant ID 70200 · Operator: Concho County Solar 1 LLC
351 MW under construction (Solar Photovoltaic), first expected Jun 2027 · EIA-860M
Nameplate—MWSummer — MW
Generators0in service · 351 MW building
Net generation—GWh12 mo
Capacity factor—no 923 generation in the last 12 months
Heat rate—thermal plants only
First online—
Capacity factor by year
Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
No capacity factor available.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| 64205 | Solar Photovoltaic | PV | 351.3 | 351.3 | planned Jun 2027 | Under construction | — | coming soon |
Owner / operator
Operator: Concho County Solar 1 LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Nearby plants
Within 80 km.
| Concho Pearl Solar and Storage | — | 5.6 km |
| Galloway 2 Solar Farm | 110 MW | 9 km |
| Norton Solar Farm | 125 MW | 13.4 km |
| Maverick Creek Wind | 492 MW | 27.3 km |
| Pioneer Field Wind Power | — | 37.2 km |
| Concho Valley Solar, LLC | 173 MW | 38 km |