Concho Pearl Solar and StoragePlanned

Concho County, Texas · EIA plant ID 67956 · Operator: Red River Clean Energy
SolarERCOTBA: ERCO

334 MW planned (Batteries, Solar Photovoltaic), first expected Oct 2027 · EIA-860M

Nameplate—MWSummer — MW
Generators0in service
Net generation—GWh12 mo
Capacity factor—no 923 generation in the last 12 months
Heat rate—thermal plants only
First online—

Capacity factor by year

Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
No capacity factor available.

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
CONBSBatteriesBA162.4162.4planned Oct 2027Planned—coming soon
CONPVSolar PhotovoltaicPV171.9171.9planned Oct 2027Planned—coming soon

Owner / operator

Operator: Red River Clean Energy. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).

Nearby plants

Within 80 km.
Galloway 2 Solar Farm110 MW3.7 km
Lucy Solar—5.6 km
Norton Solar Farm125 MW18.7 km
Maverick Creek Wind492 MW24.1 km
Rattlesnake Power, LLC160 MW38.2 km
Pioneer Field Wind Power—40 km