← Back to map

Iron Horse Solar 4, LLC

Middlesex County, Massachusetts · EIA plant ID 60799 · Operator: Iron Horse Solar 4, LLC
SolarSolar PhotovoltaicISONEBA: ISNE
Nameplate5MWSummer 5 MW
Generators1in service
Net generation7GWh12 mo to Dec 2025
Capacity factor18%solar units, summer MW
Heat rate—thermal plants only
First online2017

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
00.250.50.751GWh20182019202020212022202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%2018202020222024202618.0% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20174.218.4%—
2018717.8%—
20197.418.8%—
20207.719.6%—
20217.117.9%—
2022820.4%—
20237.418.7%—
20246.917.4%—
20257.118.0%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
PV1Solar PhotovoltaicPV4.54.5Jun 2017Operating—coming soon

Owner / operator

Operator: Iron Horse Solar 4, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Iron Horse Solar 4, LLC100.0%5 MW

Nearby plants

Within 80 km.
Iron Horse Solar I CSG3 MW1.2 km
Shaffer5 MW1.8 km
Equinix - Billerica2 MW4.9 km
Syncarpha Tewksbury Hybrid CSG5 MW6.9 km
Tanner Street Generationretired7.2 km
Leominster (MA)-South Street-R&D3 MW7.4 km