Iron Horse Solar I CSG

Middlesex County, Massachusetts · EIA plant ID 60855 · Operator: Iron Horse Solar 1, LLC
SolarSolar PhotovoltaicISONEBA: ISNE
Nameplate3MWSummer 3 MW
Generators1in service
Net generation4GWh12 mo to Dec 2025
Capacity factor16%solar units, summer MW
Heat rate—thermal plants only
First online2016

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0200400600MWh201720182019202020212022202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%20162018202020222024202616.1% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
201600.0%—
20173.915.5%—
20184.116.2%—
20194.316.8%—
20204.517.7%—
20214.216.7%—
20224.618.2%—
20234.116.2%—
20244.316.7%—
20254.116.1%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
DOWSolar PhotovoltaicPV2.92.9Dec 2016Operating—coming soon

Owner / operator

Operator: Iron Horse Solar 1, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Iron Horse Solar 1, LLC100.0%3 MW

Nearby plants

Within 80 km.
Iron Horse Solar 4, LLC5 MW1.2 km
Shaffer5 MW1.3 km
Equinix - Billerica2 MW4.4 km
Syncarpha Tewksbury Hybrid CSG5 MW5.8 km
Leominster (MA)-South Street-R&D3 MW6.2 km
Hewlett-Packard (HP) - Andover, MA2 MW7 km