← Back to map

Mira Loma Energy Storage Facility

San Bernardino County, California · EIA plant ID 60661 · Operator: Southern California Edison Co
BatteryBatteriesCAISOBA: CISO
Nameplate20MWSummer 20 MW
Generators2in service
Net generation-2GWh12 mo to Dec 2025
Capacity factor—not meaningful for storage
Heat rate—thermal plants only
First online2016

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
-0.500.51GWh201720182019202020212022202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
No capacity factor available.

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20160——
201713.4——
20180——
20190——
20200——
20210——
20220——
20230——
2024-1.9——
2025-2.4——

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
013ABatteriesBA1010Dec 2016Operating—coming soon
013BBatteriesBA1010Dec 2016Operating—coming soon

Owner / operator

Operator: Southern California Edison Co. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Southern California Edison Co100.0%20 MW

Nearby plants

Within 80 km.
Mira Loma Peaker50 MW0.1 km
Roadhouse Energy Center—0.8 km
Chambers 4 - Eastvale LGB32 MW1.1 km
Chambers 4 - Eastvale DCA22 MW1.5 km
Mira Loma3 MW2.3 km
Solar Photovoltaic Project #32retired3 km