← Back to map

Solar Photovoltaic Project #32Retired

San Bernardino County, California · EIA plant ID 57534 · Operator: Southern California Edison Co
SolarCAISOBA: CISO

×2 MW solar retired since 2020 (latest Dec 2023)

Nameplate—MWSummer — MW
Generators0in service
Net generation—GWh12 mo
Capacity factor—no 923 generation in the last 12 months
Heat rate—thermal plants only
First online—

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0100200MWh201220162017201820192020202120222023

Capacity factor by year

Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%20162018202020222024

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20120——
20152.520.5%—
20162.418.5%—
20172.417.9%—
20182.217.1%—
20191.410.4%—
20201.511.1%—
20211.612.2%—
20221.612.3%—
20230.32.4%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
S32ASolar PhotovoltaicPV0.50.5Feb 2015Retired Dec 2023—coming soon
S32BSolar PhotovoltaicPV0.50.5Feb 2015Retired Dec 2023—coming soon
S32CSolar PhotovoltaicPV0.50.5Feb 2015Retired Dec 2023—coming soon

Owner / operator

Operator: Southern California Edison Co. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).

Nearby plants

Within 80 km.
Solar Photovoltaic Project #33retired0.3 km
PVN Milliken, LLC3 MW0.9 km
Solar Photovoltaic Project #06retired1.1 km
Niagara Bottling Ontario PHI3 MW2.3 km
Roadhouse Energy Center—2.8 km
Mira Loma Energy Storage Facility20 MW3 km