Moffett Solar Project

Jasper County, South Carolina · EIA plant ID 60658 · Operator: Dominion Renewable Energy
SolarSolar PhotovoltaicBA: SCEG
Nameplate71MWSummer 71 MW
Generators1in service
Net generation138GWh12 mo to Aug 2026
Capacity factor22%solar units, summer MW
Heat rate—thermal plants only
First online2017

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
051015GWh201820192020202120222023202420252026

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%2018202020222024202622.1% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
201735.8%—
2018143.923.6%—
2019144.223.7%—
2020136.321.7%—
2021128.920.6%—
2022137.722.0%—
202313822.1%—
202410717.1%—
2025138.522.1%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
PV1Solar PhotovoltaicPV71.471.4Dec 2017Operating—coming soon

Owner / operator

Operator: Dominion Renewable Energy. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Dominion Renewable Energy100.0%71 MW

Nearby plants

Within 80 km.
Yemassee Solar10 MW12.8 km
SCE&G Nimitz CSG8 MW14.2 km
Ridgeland Solar Project10 MW17.6 km
Seabrook Solar73 MW24.6 km
Estill Solar II10 MW26.9 km