Jasper County, South Carolina · EIA plant ID 60659 · Operator: Dominion Renewable Energy
Nameplate10MWSummer 10 MW
Generators1in service
Net generation20GWh12 mo to Aug 2026
Capacity factor23%solar units, summer MW
Heat rate—thermal plants only
First online2017
The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.
Monthly net generation
EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
Capacity factor by year
Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
| Year | Net GWh | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|
| 2017 | 13 | 25.3% | — |
| 2018 | 20.1 | 23.0% | — |
| 2019 | 19.8 | 22.6% | — |
| 2020 | 18 | 20.5% | — |
| 2021 | 17.8 | 20.3% | — |
| 2022 | 18.1 | 20.6% | — |
| 2023 | 18.7 | 21.3% | — |
| 2024 | 17.2 | 19.6% | — |
| 2025 | 19.9 | 22.7% | — |
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| PV1 | Solar Photovoltaic | PV | 10 | 10 | Jun 2017 | Operating | — | coming soon |
Owner / operator
Operator: Dominion Renewable Energy. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
| Dominion Renewable Energy | 100.0% | 10 MW |
Nearby plants
Within 80 km.
| SCE&G Nimitz CSG | 8 MW | 3.7 km |
| Moffett Solar Project | 71 MW | 17.6 km |
| Jasper | 1,068 MW | 19.3 km |
| Trask East Solar | 12 MW | 20 km |
| Hardeeville | retired | 21.3 km |
| McIntosh | 810 MW | 22.9 km |