← Back to map

Townsite Solar Project Hybrid

Clark County, Nevada · EIA plant ID 60654 · Operator: Townsite Solar, LLC
SolarBatteriesSolar PhotovoltaicBA: WALC
Nameplate270MWSummer 250 MW
Generators2in service
Net generation458GWh12 mo to Aug 2026
Capacity factor34%solar units, summer MW
Heat rate—thermal plants only
First online2021

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
02040GWh20222023202420252026

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%30%202120222023202420252026202733.5% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
202118.815.8%—
2022464.934.3%—
2023429.331.8%—
202444032.5%—
2025465.934.3%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
GEN01Solar PhotovoltaicPV180160Dec 2021Operating—coming soon
GEN02BatteriesBA9090Dec 2021Operating—coming soon

Owner / operator

Operator: Townsite Solar, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Townsite Solar, LLC100.0%270 MW

Nearby plants

Within 80 km.
Techren Solar V50 MW5.7 km
Techren Solar IV LLC25 MW6.9 km
Copper Mountain Solar 3255 MW8.5 km
Techren Solar II LLC200 MW10.2 km
Boulder Flats Solar—11.1 km
Boulder Solar II, LLC50 MW11.1 km