← Back to map

Boulder Solar II, LLC

Clark County, Nevada · EIA plant ID 60885 · Operator: Invenergy Services LLC
SolarSolar PhotovoltaicBA: NEVP
Nameplate50MWSummer 50 MW
Generators1in service
Net generation100GWh12 mo to Aug 2026
Capacity factor23%solar units, summer MW
Heat rate—thermal plants only
First online2017

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
051015GWh2017201820192020202120222023202420252026

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%30%2018202020222024202622.7% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
2017133.730.5%—
2018135.230.9%—
2019131.229.9%—
2020136.731.1%—
2021129.329.5%—
2022130.129.7%—
202312628.8%—
2024122.727.9%—
2025110.525.2%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
BSIISolar PhotovoltaicPV5050Jan 2017Operating—coming soon

Owner / operator

Operator: Invenergy Services LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Invenergy Services LLC100.0%50 MW

Nearby plants

Within 80 km.
Boulder Solar III LLC—2.2 km
Techren Solar II LLC200 MW2.2 km
Techren Solar III LLC25 MW2.5 km
Techren Solar I LLC100 MW2.7 km
Copper Mountain Solar 3255 MW4.6 km
Boulder Flats Solar—4.8 km