Clark County, Nevada · EIA plant ID 61930 · Operator: Techren Solar II LLC
SolarSolar PhotovoltaicBA: NEVP
Nameplate200MWSummer 200 MW
Generators1in service
Net generation449GWh12 mo to Aug 2026
Capacity factor26%solar units, summer MW
Heat rate—thermal plants only
First online2019

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0204060GWh2020202120222023202420252026

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%20%40%20192020202120222023202420252026202725.6% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
2019175.339.7%—
2020527.530.0%—
2021555.131.7%—
2022559.231.9%—
2023535.930.6%—
2024503.228.6%—
2025491.928.1%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
TECH2Solar PhotovoltaicPV200200Oct 2019Operating—coming soon

Owner / operator

Operator: Techren Solar II LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
KKR/GA100.0%200 MW

Nearby plants

Within 80 km.
Boulder Solar II, LLC50 MW2.2 km
Techren Solar I LLC100 MW2.4 km
Copper Mountain Solar 3255 MW2.5 km
Boulder Flats Solar—2.7 km
Techren Solar III LLC25 MW2.9 km
Boulder Solar III LLC—3.2 km