Techren Solar II LLC
Clark County, Nevada · EIA plant ID 61930 · Operator: Techren Solar II LLC
Nameplate200MWSummer 200 MW
Generators1in service
Net generation449GWh12 mo to Aug 2026
Capacity factor26%solar units, summer MW
Heat rate—thermal plants only
First online2019
The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.
Monthly net generation
EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
Capacity factor by year
Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
| Year | Net GWh | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|
| 2019 | 175.3 | 39.7% | — |
| 2020 | 527.5 | 30.0% | — |
| 2021 | 555.1 | 31.7% | — |
| 2022 | 559.2 | 31.9% | — |
| 2023 | 535.9 | 30.6% | — |
| 2024 | 503.2 | 28.6% | — |
| 2025 | 491.9 | 28.1% | — |
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| TECH2 | Solar Photovoltaic | PV | 200 | 200 | Oct 2019 | Operating | — | coming soon |
Owner / operator
Operator: Techren Solar II LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
| KKR/GA | 100.0% | 200 MW |
Nearby plants
Within 80 km.
| Boulder Solar II, LLC | 50 MW | 2.2 km |
| Techren Solar I LLC | 100 MW | 2.4 km |
| Copper Mountain Solar 3 | 255 MW | 2.5 km |
| Boulder Flats Solar | — | 2.7 km |
| Techren Solar III LLC | 25 MW | 2.9 km |
| Boulder Solar III LLC | — | 3.2 km |