← Back to map

Perry Solar Facility

Taylor County, Florida · EIA plant ID 60071 · Operator: Duke Energy Florida, Inc
SolarSolar PhotovoltaicBA: FPC
Nameplate5MWSummer 5 MW
Generators1in service
Net generation8GWh12 mo to Dec 2025
Capacity factor17%solar units, summer MW
Heat rate—thermal plants only
First online2016

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0200400600800MWh201720182019202020212022202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%20162018202020222024202617.2% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20162.110.9%—
2017817.9%—
20184.610.4%—
20198.719.5%—
20208.919.9%—
20216.414.3%—
20227.717.3%—
20237.216.1%—
20247.717.1%—
20257.717.2%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
XXXXXSolar PhotovoltaicPV5.15.1Aug 2016Operating—coming soon

Owner / operator

Operator: Duke Energy Florida, Inc. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Duke Energy Florida, Inc100.0%5 MW

Nearby plants

Within 80 km.
Buckeye Florida LPretired6.5 km
Sundance Renewable Energy Center75 MW30.3 km
Winquepin Renewable Energy Center75 MW31 km
Middle Lake—35.9 km
Norton Creek75 MW36.6 km
Suwannee River198 MW46.3 km