Buckeye Florida LPRetired
Taylor County, Florida · EIA plant ID 50466 · Operator: Buckeye Florida Ltd Partners
×73 MW other retired since 2020 (latest Sep 2023)
Nameplate—MWSummer — MW
Generators0in service
Net generation—GWh12 mo
Capacity factor—no 923 generation in the last 12 months
Heat rate—Btu/kWhfossil units, electric fuel, HHV
First online—
Monthly net generation
EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
Capacity factor by year
Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Annual data table
| Year | Net GWh | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|
| 2001 | 315.1 | 95.1% | 10,867 |
| 2002 | 336 | 92.0% | 13,595 |
| 2003 | 328.5 | 90.8% | 13,883 |
| 2004 | 330.4 | 89.0% | 5,396 |
| 2005 | 325.5 | 92.3% | 5,396 |
| 2006 | 324.1 | 92.6% | 5,396 |
| 2007 | 324.8 | 92.1% | 5,396 |
| 2008 | 306.3 | 89.1% | 5,396 |
| 2009 | 310.3 | 82.0% | 5,396 |
| 2010 | 293.1 | 84.6% | 5,396 |
| 2011 | 362.9 | 76.9% | 5,396 |
| 2012 | 384.8 | 80.7% | 5,396 |
| 2013 | 388.5 | 97.0% | 5,396 |
| 2014 | 316.4 | 77.3% | 5,396 |
| 2015 | 333 | 86.0% | 5,396 |
| 2016 | 334.6 | 79.6% | 7,182 |
| 2017 | 307 | 72.1% | 7,182 |
| 2018 | 307.7 | 75.3% | 7,182 |
| 2019 | 321.8 | 73.9% | 7,182 |
| 2020 | 271.6 | 61.0% | 7,182 |
| 2021 | 277.9 | 58.6% | 7,182 |
| 2022 | 270.5 | 76.4% | 7,182 |
| 2023 | 0 | 0.0% | — |
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| GEN2 | Wood/Wood Waste Biomass | ST | 7.8 | 5.3 | Jul 1953 | Retired Sep 2023 | — | coming soon |
| GEN3 | Wood/Wood Waste Biomass | ST | 7.5 | 7.9 | Jul 1965 | Retired Sep 2023 | — | coming soon |
| GEN4 | Wood/Wood Waste Biomass | ST | 16.9 | 8.7 | Jul 1956 | Retired Sep 2023 | — | coming soon |
| GEN5 | Wood/Wood Waste Biomass | ST | 11 | 7.7 | Jul 1964 | Retired Sep 2023 | — | coming soon |
| GEN6 | Wood/Wood Waste Biomass | ST | 29.8 | 2.6 | Jan 2011 | Retired Sep 2023 | — | coming soon |
Owner / operator
Operator: Buckeye Florida Ltd Partners. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Nearby plants
Within 80 km.
| Perry Solar Facility | 5 MW | 6.5 km |
| Sundance Renewable Energy Center | 75 MW | 31.2 km |
| Winquepin Renewable Energy Center | 75 MW | 32.3 km |
| Middle Lake | — | 38.9 km |
| Norton Creek | 75 MW | 39.7 km |
| Suwannee River | 198 MW | 47.6 km |