Middle LakeUnder construction

Madison County, Florida · EIA plant ID 68824 · Operator: Florida Power & Light Co
SolarBA: FPL

75 MW under construction (Solar Photovoltaic), first expected Apr 2027 · EIA-860M

Nameplate—MWSummer — MW
Generators0in service · 75 MW building
Net generation—GWh12 mo
Capacity factor—no 923 generation in the last 12 months
Heat rate—thermal plants only
First online—

Capacity factor by year

Net MWh ÷ (summer MW × hours), primary-fuel units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
No capacity factor available.

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
1Solar PhotovoltaicPV74.574.5planned Apr 2027Under construction—coming soon

Owner / operator

Operator: Florida Power & Light Co. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).

Nearby plants

Within 80 km.
Norton Creek75 MW1.1 km
Winquepin Renewable Energy Center75 MW11.6 km
Sundance Renewable Energy Center75 MW13.4 km
Suwannee5 MW15.4 km
Suwannee River198 MW15.4 km
Suwannee Solar Facility9 MW16 km