Innovative Solar 55
Robeson County, North Carolina · EIA plant ID 59676 · Operator: Cypress Creek Renewables
Nameplate7MWSummer 7 MW
Generators1in service
Net generation4GWh12 mo to Dec 2025
Capacity factor7%solar units, summer MW
Heat rate—thermal plants only
First online2017
Monthly net generation
EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
Capacity factor by year
Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
| Year | Net GWh | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|
| 2017 | 0 | 0.0% | — |
| 2018 | 4.2 | 7.4% | — |
| 2019 | 8.9 | 15.6% | — |
| 2020 | 8.7 | 15.2% | — |
| 2021 | 8.3 | 14.6% | — |
| 2022 | 9.2 | 16.1% | — |
| 2023 | 8.9 | 15.7% | — |
| 2024 | 9 | 15.8% | — |
| 2025 | 4 | 7.0% | — |
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| IS044 | Solar Photovoltaic | PV | 6.5 | 6.5 | Dec 2017 | Operating | — | coming soon |
Owner / operator
Operator: Cypress Creek Renewables. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
| Cypress Creek Renewables | 100.0% | 7 MW |
Nearby plants
Within 80 km.
| Railroad Solar Farm, LLC | 4 MW | 3.6 km |
| Deep Branch Farm | 5 MW | 3.6 km |
| Three Bridge | 2 MW | 3.6 km |
| Laurinburg Solar, LLC (Heelstone) | 2 MW | 7.3 km |
| Innovative Solar 48 | 5 MW | 8 km |