← Back to map

Laurinburg Solar, LLC (Heelstone)

Robeson County, North Carolina · EIA plant ID 60200 · Operator: SRE Utility Solar 1, LLC
SolarSolar PhotovoltaicBA: DUK
Nameplate2MWSummer 2 MW
Generators1in service
Net generation4GWh12 mo to Dec 2025
Capacity factor24%solar units, summer MW
Heat rate—thermal plants only
First online2015

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0200400MWh2016201720182019202020212022202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%20162018202020222024202624.1% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20150.16.9%—
20164.225.0%—
20174.225.4%—
2018424.0%—
20193.923.6%—
20203.722.4%—
20213.822.9%—
20223.923.6%—
20233.923.5%—
20244.124.8%—
2025424.1%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
LAURSolar PhotovoltaicPV21.9Dec 2015Operating—coming soon

Owner / operator

Operator: SRE Utility Solar 1, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
SRE Utility Solar 1, LLC100.0%2 MW

Nearby plants

Within 80 km.
Innovative Solar 485 MW0.8 km
Maxton Solar, LLC5 MW1.9 km
Watts Farm5 MW4.2 km
Thigpen Farms Solar, LLC5 MW5.2 km
Progress Solar III, LLC4 MW5.4 km
Innovative Solar 557 MW7.3 km