Holly Swamp Solar, LLC

Robeson County, North Carolina · EIA plant ID 63695 · Operator: North Carolina El Member Corp
SolarSolar PhotovoltaicBA: CPLE
Nameplate2MWSummer 2 MW
Generators1in service
Net generation2GWh12 mo to Dec 2025
Capacity factor12%solar units, summer MW
Heat rate—thermal plants only
First online2020

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0100200300400500MWh20212022202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%202020212022202320242025202612.3% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
202000.0%—
20214.324.8%—
20223.318.9%—
20234.324.8%—
20244.324.6%—
20252.212.3%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
13502Solar PhotovoltaicPV22Nov 2020Operating—coming soon

Owner / operator

Operator: North Carolina El Member Corp. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
North Carolina El Member Corp100.0%2 MW

Nearby plants

Within 80 km.
Railroad Solar Farm, LLC4 MW5.2 km
Panda Solar NC 3, LLC2 MW5.2 km
Deep Branch Farm5 MW6.1 km
Three Bridge2 MW6.2 km
Innovative Solar 557 MW8.7 km
Stone Solar5 MW12.8 km