Holly Swamp Solar, LLC
Robeson County, North Carolina · EIA plant ID 63695 · Operator: North Carolina El Member Corp
Nameplate2MWSummer 2 MW
Generators1in service
Net generation2GWh12 mo to Dec 2025
Capacity factor12%solar units, summer MW
Heat rate—thermal plants only
First online2020
Monthly net generation
EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
Capacity factor by year
Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
| Year | Net GWh | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|
| 2020 | 0 | 0.0% | — |
| 2021 | 4.3 | 24.8% | — |
| 2022 | 3.3 | 18.9% | — |
| 2023 | 4.3 | 24.8% | — |
| 2024 | 4.3 | 24.6% | — |
| 2025 | 2.2 | 12.3% | — |
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| 13502 | Solar Photovoltaic | PV | 2 | 2 | Nov 2020 | Operating | — | coming soon |
Owner / operator
Operator: North Carolina El Member Corp. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
| North Carolina El Member Corp | 100.0% | 2 MW |
Nearby plants
Within 80 km.
| Railroad Solar Farm, LLC | 4 MW | 5.2 km |
| Panda Solar NC 3, LLC | 2 MW | 5.2 km |
| Deep Branch Farm | 5 MW | 6.1 km |
| Three Bridge | 2 MW | 6.2 km |
| Innovative Solar 55 | 7 MW | 8.7 km |
| Stone Solar | 5 MW | 12.8 km |