Innovative Solar 6
Buncombe County, North Carolina · EIA plant ID 59542 · Operator: Cypress Creek Renewables
Nameplate4MWSummer 4 MW
Generators1in service
Net generation5GWh12 mo to Dec 2025
Capacity factor15%solar units, summer MW
Heat rate—thermal plants only
First online2016
Monthly net generation
EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
Capacity factor by year
Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
Heat rate by year
Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
| Year | Net GWh | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|
| 2016 | 5.8 | 18.3% | — |
| 2017 | 3.2 | 10.1% | — |
| 2018 | 5.7 | 18.0% | — |
| 2019 | 6.5 | 20.5% | — |
| 2020 | 6.1 | 19.3% | — |
| 2021 | 5.5 | 17.3% | — |
| 2022 | 6.3 | 19.9% | — |
| 2023 | 6.5 | 20.6% | — |
| 2024 | 4.6 | 14.7% | — |
| 2025 | 4.9 | 15.4% | — |
Generators
EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
| Gen ID | Technology | Prime mover | Nameplate MW | Summer MW | Online | Status | Planned retirement | OEM / model |
|---|---|---|---|---|---|---|---|---|
| IS6 | Solar Photovoltaic | PV | 3.6 | 3.6 | Jan 2016 | Operating | — | coming soon |
Owner / operator
Operator: Cypress Creek Renewables. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
| Cypress Creek Renewables | 100.0% | 4 MW |
Nearby plants
Within 80 km.
| Marshall Dam | 5 MW | 5 km |
| Craggy Energy Storage | 31 MW | 9.3 km |
| Metropolitan Sewerage District | 2 MW | 10.1 km |
| Woodfin Solar | 5 MW | 10.1 km |
| Ivy River Hydro | 1 MW | 15.2 km |
| Biltmore Solar Fields | 2 MW | 15.4 km |