Metropolitan Sewerage District

Buncombe County, North Carolina · EIA plant ID 10181 · Operator: Metropolitan Sewerage District
HydroConventional HydroelectricBA: CPLE
Nameplate2MWSummer 2 MW
Generators3in service
Net generation5GWh12 mo to Aug 2026
Capacity factor23%hydro units, summer MW
Heat rate—thermal plants only
First online1988

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
00.51GWh2001200320052007200920112013201520172019202120232025

Capacity factor by year

Net MWh ÷ (summer MW × hours), hydro units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%20%40%60%2005201020152020202522.7% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
200100.0%—
20026.531.0%—
20031.15.4%—
200412.459.0%—
200512.660.0%—
2006838.3%—
20073.717.6%—
2008523.8%—
20091047.6%—
20107.133.6%—
20116.531.1%—
20128.239.1%—
20139.243.8%—
201410.449.3%—
20156.932.9%—
20168.640.6%—
20176.531.1%—
20188.138.4%—
20198.440.0%—
20208.540.5%—
20218.238.9%—
20226.430.2%—
20234.421.0%—
20246.129.1%—
20253.516.6%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
GEN1Conventional HydroelectricHY0.80.8Sep 1988Operating (Standby / backup)—coming soon
GEN2Conventional HydroelectricHY0.80.8Sep 1988Operating—coming soon
GEN3Conventional HydroelectricHY0.80.8Sep 1988Operating—coming soon

Owner / operator

Operator: Metropolitan Sewerage District. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Metropolitan Sewerage District100.0%2 MW

Nearby plants

Within 80 km.
Woodfin Solar5 MW1.2 km
Craggy Energy Storage31 MW1.2 km
Biltmore Solar Fields2 MW9.9 km
Innovative Solar 64 MW10.1 km
Marshall Dam5 MW11.6 km
Ivy River Hydro1 MW13.7 km