Park Meridian #1

Riverside County, California · EIA plant ID 59539 · Operator: Altus Power America Management, LLC
SolarSolar PhotovoltaicCAISOBA: CISO
Nameplate2MWSummer 2 MW
Generators1in service
Net generation3GWh12 mo to Dec 2025
Capacity factor20%solar units, summer MW
Heat rate—thermal plants only
First online2015

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0100200300MWh2016201720182019202020212022202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%20162018202020222024202619.6% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20152.623.7%—
20163.223.9%—
2017322.9%—
20182.418.2%—
20192.922.1%—
20202.922.2%—
20212.821.4%—
20222.821.4%—
20232.418.3%—
20242.518.9%—
20252.619.6%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
1Solar PhotovoltaicPV1.51.5Mar 2015Operating—coming soon

Owner / operator

Operator: Altus Power America Management, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Altus Power America Management, LLC100.0%2 MW

Nearby plants

Within 80 km.
Chambers 4 - Riverside LGB6 2 MW2.3 km
Springs Generating Station40 MW4 km
SunEdison Walgreens Moreno Valley1 MW5.9 km
Perris DC 5 - sline0152 MW7 km
EMWD - Moreno Valley RWRF2 MW7.1 km
Broadway 2 - UC Riverside3 MW9.3 km