← Back to map

Broadway 2 - UC Riverside

Riverside County, California · EIA plant ID 64579 · Operator: GSRP
SolarSolar PhotovoltaicCAISOBA: CISO
Nameplate3MWSummer 3 MW
Generators1in service
Net generation4GWh12 mo to Dec 2025
Capacity factor15%solar units, summer MW
Heat rate—thermal plants only
First online2014

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0200400600MWh202020212022202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%202020212022202320242025202615.0% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20205.119.3%—
20215.119.3%—
20225.320.2%—
20233.714.1%—
20242.38.5%—
20253.915.0%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
GEN1Solar PhotovoltaicPV33Sep 2014Operating—coming soon

Owner / operator

Operator: GSRP. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
PNC Energy Capital LLC100.0%3 MW

Nearby plants

Within 80 km.
UC Riverside Lots 30 & 324 MW0 km
SSI West Riverside Landfill LLC3 MW4.3 km
Riverside Community College3 MW4.6 km
Tequesquite Landfill Solar PV Project7 MW5.1 km
Condor Energy Storage LLC200 MW5.6 km
Springs Generating Station40 MW5.6 km