Tequesquite Landfill Solar PV Project

Riverside County, California · EIA plant ID 60035 · Operator: Solar Star California XXXI, LLC
SolarSolar PhotovoltaicCAISOBA: CISO
Nameplate7MWSummer 7 MW
Generators1in service
Net generation11GWh12 mo to Dec 2025
Capacity factor17%solar units, summer MW
Heat rate—thermal plants only
First online2015

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
00.511.52GWh2016201720182019202020212022202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%20%40%20162018202020222024202616.9% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20156.640.9%—
201615.424.0%—
201714.723.0%—
201814.923.2%—
201914.522.7%—
202013.921.7%—
20218.312.9%—
202213.120.5%—
202313.220.6%—
202412.719.8%—
202510.816.9%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
RPU1Solar PhotovoltaicPV7.37.3Oct 2015Operating—coming soon

Owner / operator

Operator: Solar Star California XXXI, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
8point3 Operating Company LLC100.0%7 MW

Nearby plants

Within 80 km.
Riverside Community College3 MW0.8 km
SSI West Riverside Landfill LLC3 MW0.9 km
CA Riverside 2356 Fleetwood Dr.—3.8 km
Broadway 2 - UC Riverside3 MW5.1 km
UC Riverside Lots 30 & 324 MW5.1 km
Riverside Energy Resource Center196 MW6.4 km