← Back to map

SunEdison Walgreens Moreno Valley

Riverside County, California · EIA plant ID 57004 · Operator: SunE WG113 Moreno Valley LLC
SolarSolar PhotovoltaicCAISOBA: CISO
Nameplate1MWSummer 1 MW
Generators1in service
Net generation1GWh12 mo to Dec 2025
Capacity factor8%solar units, summer MW
Heat rate—thermal plants only
First online2007

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0100200300MWh200920112013201520172019202120232025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%20102015202020257.6% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
2009225.5%—
2010225.0%—
2011224.8%—
2012224.7%—
20131.923.5%—
20141.823.3%—
20151.822.6%—
20160.911.9%—
20171.215.1%—
20181.721.3%—
20190.911.3%—
20201.518.5%—
20211.316.9%—
20221.113.6%—
20231.316.0%—
20240.911.4%—
20250.67.6%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
1Solar PhotovoltaicPV10.9Sep 2007Operating—coming soon

Owner / operator

Operator: SunE WG113 Moreno Valley LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
SunE WG113 Moreno Valley LLC100.0%1 MW

Nearby plants

Within 80 km.
EMWD - Moreno Valley RWRF2 MW1.5 km
Perris DC 5 - sline0152 MW1.9 km
Perris8 MW5.5 km
Park Meridian #12 MW5.9 km
Chambers 4 - Riverside LGB6 2 MW6.7 km
Springs Generating Station40 MW9.2 km