Santa Cruz County, Arizona · EIA plant ID 59044 · Operator: UNS Electric, Inc
SolarSolar PhotovoltaicBA: TEPC
Nameplate6MWSummer 6 MW
Generators1in service
Net generation3GWh12 mo to Dec 2025
Capacity factor6%solar units, summer MW
Heat rate—thermal plants only
First online2014

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
00.51GWh20152016201720182019202020212022202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%20142016201820202022202420265.8% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20148.218.6%—
201510.319.6%—
20161222.7%—
201711.321.4%—
201811.321.4%—
201911.321.4%—
202011.922.6%—
20219.818.7%—
20227.914.9%—
20234.38.2%—
202400.0%—
202535.8%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
RRSFSolar PhotovoltaicPV66Mar 2014Operating—coming soon

Owner / operator

Operator: UNS Electric, Inc. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
UNS Electric, Inc100.0%6 MW

Nearby plants

Within 80 km.
Valencia108 MW16.8 km
Wilmot Energy Center II200 MW49.1 km
Avalon Solar II16 MW55.9 km
Avalon Solar29 MW55.9 km
Babacomari Solar160 MW59 km
Wilmot Energy Center LLC160 MW61.4 km