← Back to map

Avalon Solar II

Pima County, Arizona · EIA plant ID 60062 · Operator: Avalon Solar Partners II, LLC
SolarSolar PhotovoltaicBA: TEPC
Nameplate16MWSummer 16 MW
Generators1in service
Net generation43GWh12 mo to Dec 2025
Capacity factor31%solar units, summer MW
Heat rate—thermal plants only
First online2016

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
024GWh201720182019202020212022202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%10%20%30%20162018202020222024202630.6% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
201638.232.5%—
20174431.4%—
201843.330.9%—
201942.830.5%—
202044.531.7%—
202143.631.1%—
202243.831.3%—
202343.931.3%—
202443.831.2%—
202542.930.6%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
ASIISolar PhotovoltaicPV1616Mar 2016Operating—coming soon

Owner / operator

Operator: Avalon Solar Partners II, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Firstar Development, LLC99.0%16 MW
CRE-Avalon Arizona LLC1.0%0 MW

Nearby plants

Within 80 km.
Avalon Solar29 MW0.2 km
Wilmot Energy Center LLC160 MW7.8 km
TJX Tucson1 MW14.4 km
Roadrunner Reserve Phase 2200 MW15.2 km
Roadrunner Reserve Phase 1200 MW15.6 km
Pima Community College - East Campus1 MW16.4 km