← Back to map

Babacomari Solar

Cochise County, Arizona · EIA plant ID 67797 · Operator: Babacomari Solar, LLC
SolarSolar PhotovoltaicBA: TEPC
Nameplate160MWSummer 160 MW
Generators1in service
Net generation288GWh12 mo to Aug 2026
Capacity factor41%solar units, summer MW
Heat rate—thermal plants only
First online2026

The 12-month figures include preliminary EIA-923 months, which EIA revises. Final data runs through Dec 2025.

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
010203040GWh

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%20%40%2026202740.8% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
BSSolar PhotovoltaicPV160160Mar 2026Operating—coming soon

Owner / operator

Operator: Babacomari Solar, LLC. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Babacomari Solar, LLC100.0%160 MW

Nearby plants

Within 80 km.
Wilmot Energy Center II200 MW11 km
Fort Huachuca Solar PV Project18 MW12.8 km
Valencia108 MW58.9 km
Rio Rico Solar6 MW59 km
Roadrunner Reserve Phase 1200 MW59.8 km
Roadrunner Reserve Phase 2200 MW60.2 km