Route 57 Solar

Hampden County, Massachusetts · EIA plant ID 59031 · Operator: Citizens Enterprises Corporation
SolarSolar PhotovoltaicISONEBA: ISNE
Nameplate2MWSummer 2 MW
Generators1in service
Net generation2GWh12 mo to Dec 2025
Capacity factor17%solar units, summer MW
Heat rate—thermal plants only
First online2013

Monthly net generation

EIA-923, all units at the plant. Net of station use; storage can go negative.
FinalPreliminary
0100200300MWh201420152016201720182019202020212022202320242025

Capacity factor by year

Net MWh ÷ (summer MW × hours), solar units. Each year uses that year's EIA-860 ratings; the hollow dot is the latest 12 months.
0%5%10%15%201420162018202020222024202616.6% · 12 mo

Heat rate by year

Electric fuel MMBtu × 1000 ÷ net MWh (Btu/kWh, HHV), fossil units only; CT + CA counted as one combined-cycle block.
Heat rate applies to fuel-burning (thermal) units only.
Annual data table
YearNet GWhCapacity factorHeat rate (Btu/kWh)
20132.118.6%—
20142.216.7%—
20152.216.6%—
20162.418.1%—
20172.116.3%—
20182.115.9%—
20192.116.3%—
20202.317.3%—
20212.317.2%—
20222.519.3%—
20232.116.3%—
20242.317.1%—
20252.216.6%—

Generators

EIA-860 (annual) with EIA-860M updates through Sep 2026. EIA-923 reports generation by plant, prime mover and fuel, not by unit, so unit-level output isn't shown.
Gen IDTechnologyPrime moverNameplate MWSummer MWOnlineStatusPlanned retirementOEM / model
27Solar PhotovoltaicPV1.51.5Mar 2013Operating—coming soon

Owner / operator

Operator: Citizens Enterprises Corporation. Ownership shares by in-service nameplate MW (EIA-860 Schedule 4; units not listed there are wholly owned by the operator).
Citizens Solar Holdings LLC100.0%2 MW

Nearby plants

Within 80 km.
Berkshire Power289 MW1.8 km
ENGIE 2019 ProjectCo-MA1, LLC5 MW2.1 km
CES Agawam Tuckahoe Solar Hybrid6 MW2.2 km
Agawam Solar2 MW4.8 km
Canis Major Solar Farm2 MW5.7 km
Citizens Agawam Landfill Solar2 MW6.7 km